Sign In | Join Free | My uabig.com
China Shenzhen Industrial Man Product RP&M Co., Ltd logo
Shenzhen Industrial Man Product RP&M Co., Ltd
Shenzhen INDUSTRIAL-MAN RP&M Co., Ltd.
Active Member

2 Years

Home > CNC Lathe Machine Parts >

Vacuum Heat Treated CNC Lathe Parts with HRC48-52 Hardness and 7-15 Days Lead Time in Metallic Silver

Shenzhen Industrial Man Product RP&M Co., Ltd
Contact Now

Vacuum Heat Treated CNC Lathe Parts with HRC48-52 Hardness and 7-15 Days Lead Time in Metallic Silver

  • 1
  • 2
  • 3

Contact Now

Vacuum Heat Treatment HRC48-52 CNC Lathe Parts
Precision-Engineered Metal Components with 7-15 Day Lead Time
Our CNC Lathe Parts are precision-engineered components designed for modern manufacturing processes. Manufactured with advanced CNC technology and strict quality control, these parts deliver superior accuracy, durability, and efficiency for industrial applications.
Key Features
  • Customizable Design: Tailored to meet specific size and specification requirements
  • High Precision: Tight tolerances for accurate CNC machining components
  • Durable Construction: Vacuum heat treated to HRC48-52 hardness
  • Fast Turnaround: Typical lead time of 7-15 days
  • Versatile Applications: Suitable for machinery and automotive industries
  • Material Options: Available in metallic silver or customized finishes
Technical Specifications
Parameter Details
Applications Machinery Industry, Automotive Industry
Heat Treatment Vacuum Heat Treatment + HRC48-52
Color Metallic Silver or Customized
Precision High Precision Machining
Weight Range 0.5-5 Kg (varies by part)
Lead Time 7-15 Days
Shipping 5-25 Work Days
Industrial Applications
These CNC lathe parts are essential components for:
  • Precision machinery maintenance and enhancement
  • Automotive engine components and assembly systems
  • Metalworking and fabrication equipment
  • Aerospace and heavy machinery manufacturing
  • Electronic and industrial tool production
The vacuum heat treatment process ensures exceptional durability and wear resistance, making these parts ideal for high-stress environments. Their customizable design allows for perfect integration with existing equipment, optimizing performance and reducing downtime.

Product Tags:

Vacuum Heat Treatment CNC Lathe Parts

      

HRC48-52 Hardness Computer Numerical Control Parts

      

7-15 Days Lead Time Computerized Lathe Parts

      
Wholesale Vacuum Heat Treated CNC Lathe Parts with HRC48-52 Hardness and 7-15 Days Lead Time in Metallic Silver from china suppliers

Vacuum Heat Treated CNC Lathe Parts with HRC48-52 Hardness and 7-15 Days Lead Time in Metallic Silver Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shenzhen Industrial Man Product RP&M Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)